Backsplash & Tile Floor in The Woodlands, TX — finished in 2 to 4 days.
Standalone tile installation for kitchen backsplash, mudroom floor, laundry room floor, or foyer entry. Quick install, big visual impact, finished in less than a week.
estimate Done in
2–4 days Fully insured
$1M liability


High-impact tile, finished in days.
Tile work is one of the highest-impact updates you can make to a kitchen or small room — and one of the most visible. A new backsplash transforms how a kitchen looks; a new tile floor in the entry, mudroom, or laundry instantly modernizes high-traffic spaces.
Our standalone tile package is built for projects that don't require demolishing a shower or remodeling a full bathroom — just clean tile work in 2–4 days with a fixed starting price. We handle prep, install, grout, seal, and cleanup.
If you need shower wall tile or full bathroom tile work, that's part of our Walk-In Shower Conversion or Bathroom Refresh packages.
For broader tile and natural stone scopes — marble floors, large-format porcelain, shower walls — see our Custom Tile & Stone Work page.
Call for a free estimateEvery Backsplash & Tile Floor includes
✓ Included in starting price
- Site protection — countertops, appliances, adjacent floors covered before work begins
- Wall or floor prep — clean, sand if needed, address any minor surface issues
- Tile install with proper thinset adhesive, level lines, even spacing
- Tile cuts — at outlets, around windows, edges, and any obstacles
- Grout application — color-matched to your tile (5 standard grout colors available)
- Sealing — natural stone or porous tile sealed; ceramic/porcelain typically doesn't need sealing
- Caulk transitions — between tile and countertop, tile and wall, tile and adjacent flooring
- Standard tile material included — most subway tile, mosaic, or basic porcelain; premium materials priced per project
- Final cleanup and removal of all tile dust, debris, leftover materials
— Available as add-on (extra cost)
- Premium tile material (designer stone, large-format porcelain — pass-through cost added to your written estimate)
- Demo of existing tile or backsplash (priced per project based on what's there)
- Removal of countertop or appliances if needed for backsplash install (usually not required)
- Plumbing or electrical work (we don't move outlets or plumbing — you'd need that done before we tile)
- Painting around new tile (touch-up paint and wall corners — priced per project)
- Underlayment for floor tile (if subfloor needs prep — Schluter DITRA or backer board; priced per project)
- Heated floor system under tile (add-on — priced per project)
All add-ons priced transparently in your written estimate before any work begins.
Day-by-day what happens
A typical 2–4 days timeline. We give you exact dates after the estimate is signed.
Cover counters, appliances, adjacent floors. Remove old backsplash or floor tile if applicable. Wall or subfloor prep.
Install the bulk of the tile. Cuts at outlets, edges, and obstacles. Most installs covered in this day.
Grout applied 24 hours after tile is set. Once grout cures, caulk transitions and seal porous materials if needed.
Final cleanup, polish, removal of all materials. Walk-through with photos for your records.
What drives the final price
Starting price covers most jobs at the basic tier. Final estimate based on your specific scope, materials, and any add-ons you choose.
Standard
Standard backsplash up to 30 sq ft (typical 8' kitchen run) or floor tile up to 50 sq ft. Subway tile, basic mosaics, or porcelain. Most popular tier.
Mid-Range
Larger backsplash (30–60 sq ft) or floor (50–120 sq ft). Premium tile or designer pattern (herringbone, basket weave, custom layout).
Large/Premium
Whole kitchen backsplash + floor combo, large foyers/entries, premium materials (natural stone, large-format porcelain), or complex patterns (multi-color mosaics, mixed materials).
Serving The Woodlands & North Houston
Most of our work is within a 30-minute drive of our Spring, TX HQ.
Ready to get your backsplash & tile floor started?
Free written quote within 48 hours. Most projects start within 1–2 weeks.