Bathroom Remodeling The Woodlands TX | Fixup Experts
Primary bathroom remodel with a frameless glass shower, marble-look tile, arched window and a freestanding tub

Bathroom Remodeling — The Woodlands, TX.

Full bathroom renovations: custom tile, vanities, walk-in showers and tubs. Nick runs every project himself. Our crew does the tile, carpentry and finish work, and a licensed plumber we bring in handles the plumbing.

5.0 on Google · 53 reviews Insured · 1-year written warranty

The first reason I hired Nick is the knowledge he and his team brought regarding the project. He discussed doing it the right way… His price was reasonable. The work was great… Thanks for the great work on our bathroom!

Rob N. · bathroom remodel in The Woodlands · Google review

Rob's primary bath in The Woodlands

The bathroom behind the review above. The shower was rebuilt as a walk-in: large-format charcoal tile, a tiled niche with a mosaic inset, a built-in bench, a mosaic shower floor and a sliding glass door.

Before any tile went up, the shower was built on wedi waterproof board, with every seam and fastener sealed. It's the step nobody sees once the job is done, and the one that decides whether a shower lasts.

Same bathroom, same doorway: studs, waterproofing, finished.
Vanity side of the same bathroom with a vessel sink and backlit mirror
Vanity side: vessel sink and a backlit mirror.
Walk-in shower with large-format charcoal tile, tiled niche, bench and sliding glass door
Charcoal tile, niche, bench, sliding glass door.
Shower walls built on wedi waterproof board with sealed seams before tile
Mid-project: wedi board, every seam and fastener sealed.

When a refresh isn't enough.

Sometimes new paint and fixtures won't fix it: the layout doesn't work, the tile is failing, or the shower has to be rebuilt from the pan up. That's a full remodel. We handle complete bathroom renovations in The Woodlands, priced per project with a free written estimate.

Every full remodel is owner-managed from demo to final walk-through. No rotating crews, and no handing your project to a foreman you've never met. Tile, vanities, carpentry and finish work are done by our own crew, and any plumbing by a licensed plumber we bring in. Every trade runs through one person: Nick.

This page covers full remodels for any bathroom in your home. Looking for something more specific? See Master Bathroom Remodel for double vanities, large walk-in showers and luxury scope, or Bathroom Refresh for a cosmetic update in 5–7 days without gut demo.

Primary bath after: frameless glass shower, marble-look tile and freestanding tub Same primary bath before: dated tiled shower and torn-up floor tile Before After
↔ Drag to compare
The same primary bath, before and after: old tile shower out, frameless glass, marble-look tile and a freestanding tub in.

Hall bath: taken to the studs, rebuilt custom.

Complete gut renovation: new framing where needed, insulation, custom shaker double vanity with full-height linen towers, quartz countertop, arched mirrors, and a marble-look porcelain tub surround with a built-in niche.

See the before and after in our portfolio
Tub and shower with marble-look porcelain tile and built-in niche
Tub surround in marble-look porcelain with a built-in niche.
Finished bathroom view with custom vanity wall and new flooring
From the doorway: new flooring and the full vanity wall.
Marble-look walk-in shower with niche and bench
Walk-in shower in marble-look tile
Tiled walk-in shower with bench and window
Tiled shower with a bench under the window
Finished vanity with wood-look tile wainscot
Vanity with a wood-look tile wainscot
Freestanding tub beside a frameless glass shower with tiled niches
Freestanding tub next to the glass shower

What a full remodel includes

Everything from the studs out, coordinated by one person.

Complete Demo

Fixtures, tile, vanity and flooring come out down to the studs and subfloor, so nothing old is hiding behind the new tile.

Plumbing Reconfiguration

Supply and drain lines moved or replaced to fit the new layout, by a licensed plumber we bring in and schedule.

Electrical Updates

New lighting, exhaust fan and GFCI outlets, brought up to current code.

Waterproofing

A sealed board-and-pan system under the tile, with every seam and fastener sealed. Rob's shower above was built on wedi.

Custom Tile Work

Shower walls, floors, niches and accent walls in the tile you choose, laid out before the first piece goes up.

Vanity, Tops & Fixtures

Custom or semi-custom cabinetry with a stone top, plus the toilet, faucets, shower valve and trim, lighting, mirror and hardware.

Bathroom remodel cost in The Woodlands

Every project is priced per scope. Bathroom size, tile selection, whether plumbing moves, and fixture quality are the main drivers. We provide a free written estimate within 48 hours.

Hall BathRefresh scope

Standard secondary bathroom. Full demo, tile, vanity, fixtures and finishes, with the existing layout kept. The hall bath above is this scope.

Primary BathMid-range scope

Larger suite with upgraded tile, a custom walk-in shower and better fixtures. Rob's bathroom above is a good example.

Premium SuiteFull custom scope

Custom tile, freestanding tub, frameless glass and a full layout rework, like the primary bath at the top of this page.

For typical market ranges, read our guide to bathroom remodel cost in The Woodlands.

Get your bathroom estimate

Takes 30 seconds. Here is what happens next.

  1. 1Nick calls you back the same day on weekdays.
  2. 2He comes out to look at the space and measure.
  3. 3You get a clear written estimate within 48 hours.

Prefer to talk now? Call 346 248 74 97.

Want to send photos with your request? Use the full estimate form. By submitting, you agree to be contacted about your estimate request. We never share your info.

Common questions

Still unsure? Call 346 248 74 97.

Cost varies with bathroom size, tile selection, fixture quality, and whether plumbing is relocated. A hall bath is less involved than a primary suite with custom tile, double vanity, freestanding tub, and frameless glass. We provide a free written estimate within 48 hours, and the walk-through of your bathroom costs nothing.
Most full bathroom remodels take 3–5 weeks from demo to completion. Timeline depends on scope, material availability, and inspections. We give you a firm schedule before starting.
Yes. For remodels involving plumbing relocation or electrical work, we pull required permits and coordinate inspections with Montgomery County or the relevant authority.
Yes. We coordinate plumbing relocation, so the toilet, sink, and shower or tub can all move. The work is done by a licensed plumber we bring in as part of the project. Moving plumbing adds cost but is often worth it for a better-functioning bathroom.