Tub-to-shower conversion in The Woodlands, TX — modern walk-in shower.
Replace an unused tub with a modern walk-in shower: owner-managed, properly waterproofed and priced per project. Free written estimate within 48 hours.
The first reason I hired Nick is the knowledge he and his team brought regarding the project. He discussed doing it the right way… His price was reasonable. The work was great… Thanks for the great work on our bathroom!
Walk-in showers we've built
More bathroom projects



When does a conversion make sense?
Most homeowners we work with have one (or more) bathtubs that haven't been used for actual bathing in years. Removing the tub and replacing with a walk-in shower is a project we manage end-to-end — tile, waterproofing, and carpentry are our crew's work; plumbing (supply line adjustments, drain relocation) is performed by a licensed plumber we coordinate as part of every conversion. Removing the tub and replacing with a walk-in shower:
- Opens up the bathroom visually — feels more spacious immediately
- Improves accessibility for aging in place or limited mobility
- Increases resale value in master bathrooms (most buyers want a primary shower, not a primary tub)
- Solves leak/water damage issues from old tub surrounds that were poorly waterproofed
When NOT to do it
If this is your only bathtub and you have small children, sell-ability may take a hit (some buyers want at least one tub). For homes with multiple bathrooms, this isn't a concern.
What drives the price
The biggest cost variables for a tub-to-shower conversion:
- Same plumbing footprint — drain stays where the tub drain was, water supply lines reused. Fastest and most straightforward path. Done in approximately 2 weeks.
- Drain relocation required — moving the drain (e.g., to install a linear drain at a different wall) requires opening the slab or sub-floor, adding days to the schedule. We scope this on-site.
- Wall removal for larger shower — combining the tub bay with adjacent space (closet conversion, removing wall to vanity) creates a larger shower footprint but adds framing, drywall, and electrical work.
Every project is priced individually — we send a free written estimate within 48 hours of the walk-through.
The conversion process — what to expect day-by-day
Our typical 14-day tub-to-shower conversion timeline:
- Day 1–2: Demo of existing tub, surround tile, and any wall framing affected. Old materials hauled out same day.
- Day 3: Plumber on-site to adjust supply lines and confirm drain placement. Inspection if permits required.
- Day 4–5: Cement board (HardieBacker or GoBoard) installed, blocking added for grab bars or bench (if requested), pre-slope mud bed poured.
- Day 6–7: Waterproofing installed on every shower surface (a Schluter KERDI membrane or a board system like wedi), with seams and the drain sealed.
- Day 8–10: Tile installed (walls first, then floor), grout applied 24 hours after tile is set.
- Day 11: Glass templated (if frameless enclosure ordered), shower fixtures installed, plumbing tested.
- Day 12–14: Caulk applied, grout sealed, glass installed (1–2 weeks later for frameless), final cleanup and walk-through.
What stays vs what changes
One reason tub-to-shower conversions are popular is that most of the existing bathroom can stay. Typically we keep:
- Vanity and countertop (unless older or damaged)
- Toilet (sometimes flushed and re-set if subfloor is opened)
- Mirror and lighting
- Bathroom flooring outside the shower (unless damaged during demo)
What always changes:
- The full tub/surround assembly (demo'd and removed)
- Wall tile in the shower zone (replaced with new tile + waterproofing)
- Shower valve and trim (current code requires pressure-balanced or thermostatic valves; older homes often have outdated valves)
- Floor inside the shower (new tile over new pre-slope)
Resale and aging-in-place considerations
Two questions homeowners weigh before a conversion:
Resale impact: In The Woodlands market, removing the only tub in a family-sized home (3+ bedrooms) can reduce resale appeal. Families with young children typically want at least one tub. If converting the master bath but keeping a guest tub, resale impact is neutral or slightly positive. If converting the only tub in a 2-bedroom or smaller home, generally positive (most second-home and downsize buyers prefer showers).
Aging-in-place: Many homeowners who convert plan to stay in the home long-term and want easier access. Curbless entry, integrated bench seating, hand-held wand on slide bar, and code-compliant grab bar backing all add meaningful value and make the bathroom usable for decades — we include these options in your written estimate.
Common questions
Honest answers to what homeowners ask most. Still unsure? Call 346 248 74 97.
Get your conversion estimate
Takes 30 seconds. Here is what happens next.
- 1Nick calls you back the same day on weekdays.
- 2He comes out to look at the space and measure.
- 3You get a clear written estimate within 48 hours.
Prefer to talk now? Call 346 248 74 97.
Most of our work is within a 30-minute drive of our Spring, TX HQ: The Woodlands, Spring, Conroe, Montgomery, Tomball and Magnolia.