Tub-to-Shower Conversion in The Woodlands TX | Fixup Experts
Walk-in shower with frameless glass and marble-look tile next to a freestanding tub

Tub-to-shower conversion in The Woodlands, TX — modern walk-in shower.

Replace an unused tub with a modern walk-in shower: owner-managed, properly waterproofed and priced per project. Free written estimate within 48 hours.

5.0 on Google · 53 reviews Insured · 1-year written warranty

The first reason I hired Nick is the knowledge he and his team brought regarding the project. He discussed doing it the right way… His price was reasonable. The work was great… Thanks for the great work on our bathroom!

Rob N. · bathroom remodel in The Woodlands · Google review
Walk-in shower with charcoal tile, a tiled niche, a bench and a sliding glass door
Charcoal tile, niche and bench
Frameless glass shower with marble-look tile
Frameless glass, marble-look tile
Marble-look walk-in shower with a niche and a bench
Marble-look tile with a bench
Tiled walk-in shower with a bench and a window
Bench under the window

When does a conversion make sense?

Most homeowners we work with have one (or more) bathtubs that haven't been used for actual bathing in years. Removing the tub and replacing with a walk-in shower is a project we manage end-to-end — tile, waterproofing, and carpentry are our crew's work; plumbing (supply line adjustments, drain relocation) is performed by a licensed plumber we coordinate as part of every conversion. Removing the tub and replacing with a walk-in shower:

  • Opens up the bathroom visually — feels more spacious immediately
  • Improves accessibility for aging in place or limited mobility
  • Increases resale value in master bathrooms (most buyers want a primary shower, not a primary tub)
  • Solves leak/water damage issues from old tub surrounds that were poorly waterproofed

When NOT to do it

If this is your only bathtub and you have small children, sell-ability may take a hit (some buyers want at least one tub). For homes with multiple bathrooms, this isn't a concern.

What drives the price

The biggest cost variables for a tub-to-shower conversion:

  • Same plumbing footprint — drain stays where the tub drain was, water supply lines reused. Fastest and most straightforward path. Done in approximately 2 weeks.
  • Drain relocation required — moving the drain (e.g., to install a linear drain at a different wall) requires opening the slab or sub-floor, adding days to the schedule. We scope this on-site.
  • Wall removal for larger shower — combining the tub bay with adjacent space (closet conversion, removing wall to vanity) creates a larger shower footprint but adds framing, drywall, and electrical work.

Every project is priced individually — we send a free written estimate within 48 hours of the walk-through.

The conversion process — what to expect day-by-day

Our typical 14-day tub-to-shower conversion timeline:

  • Day 1–2: Demo of existing tub, surround tile, and any wall framing affected. Old materials hauled out same day.
  • Day 3: Plumber on-site to adjust supply lines and confirm drain placement. Inspection if permits required.
  • Day 4–5: Cement board (HardieBacker or GoBoard) installed, blocking added for grab bars or bench (if requested), pre-slope mud bed poured.
  • Day 6–7: Waterproofing installed on every shower surface (a Schluter KERDI membrane or a board system like wedi), with seams and the drain sealed.
  • Day 8–10: Tile installed (walls first, then floor), grout applied 24 hours after tile is set.
  • Day 11: Glass templated (if frameless enclosure ordered), shower fixtures installed, plumbing tested.
  • Day 12–14: Caulk applied, grout sealed, glass installed (1–2 weeks later for frameless), final cleanup and walk-through.

What stays vs what changes

One reason tub-to-shower conversions are popular is that most of the existing bathroom can stay. Typically we keep:

  • Vanity and countertop (unless older or damaged)
  • Toilet (sometimes flushed and re-set if subfloor is opened)
  • Mirror and lighting
  • Bathroom flooring outside the shower (unless damaged during demo)

What always changes:

  • The full tub/surround assembly (demo'd and removed)
  • Wall tile in the shower zone (replaced with new tile + waterproofing)
  • Shower valve and trim (current code requires pressure-balanced or thermostatic valves; older homes often have outdated valves)
  • Floor inside the shower (new tile over new pre-slope)

Resale and aging-in-place considerations

Two questions homeowners weigh before a conversion:

Resale impact: In The Woodlands market, removing the only tub in a family-sized home (3+ bedrooms) can reduce resale appeal. Families with young children typically want at least one tub. If converting the master bath but keeping a guest tub, resale impact is neutral or slightly positive. If converting the only tub in a 2-bedroom or smaller home, generally positive (most second-home and downsize buyers prefer showers).

Aging-in-place: Many homeowners who convert plan to stay in the home long-term and want easier access. Curbless entry, integrated bench seating, hand-held wand on slide bar, and code-compliant grab bar backing all add meaningful value and make the bathroom usable for decades — we include these options in your written estimate.

Common questions

Honest answers to what homeowners ask most. Still unsure? Call 346 248 74 97.

Possibly, in some markets — buyers with young children often want at least one bathtub in the home. For homes with multiple bathrooms, removing one tub typically doesn't hurt value and can increase it (modern walk-in shower is more desirable than old tub in most cases).
Yes — instead of a standard walk-in, consider a 'wet room' design with both shower and freestanding soaking tub. This adds complexity and material cost but preserves both bathing options. We include this configuration in your custom written estimate.
We haul it away. Old fiberglass and acrylic tubs go to landfill. Cast iron tubs sometimes go to scrap metal recycling.
Drain relocation depends on what's beneath the bathroom. On a slab foundation we have to score and break the concrete, re-route the drain line, and re-pour — this adds several days to the schedule. On a pier-and-beam or second-floor bathroom it's much faster because we work from below or above. We assess this during the on-site estimate and include all costs in your written quote.
In a 3+ bedroom family home, possibly. Most family buyers want at least one tub for bathing children. In a 2-bedroom home, condo, or downsize property, removing the tub generally has neutral or positive resale impact since most buyers in those segments prefer showers. We can advise during the estimate based on your home and likely future buyer.
Yes. A common plan is a tub-to-shower conversion in the master bath combined with a freestanding soaking tub installation in another bathroom (often the guest bath or a converted closet space). This gives you the modern shower experience daily plus tub access for occasional use or resale appeal.

Get your conversion estimate

Takes 30 seconds. Here is what happens next.

  1. 1Nick calls you back the same day on weekdays.
  2. 2He comes out to look at the space and measure.
  3. 3You get a clear written estimate within 48 hours.

Prefer to talk now? Call 346 248 74 97.

Want to send photos with your request? Use the full estimate form. By submitting, you agree to be contacted about your estimate request. We never share your info.