Package · Fixed pricing · The Woodlands, TX

Bathroom Refresh in The Woodlands, TX — updated bathroom in 5 to 7 days.

Tired of looking at a dated bathroom but don't want a 5-week gut remodel? Our Bathroom Refresh package replaces the high-impact items — vanity, fixtures, lights, mirror, paint, floor — without rebuilding the shower or moving plumbing. Done in one week. We manage the whole project; a licensed plumber we bring in handles the toilet and fixture connections so everything is done to code.

Free written
estimate
Done in
5–7 days
Fully insured
$1M liability
Marble walk-in shower remodel in The Woodlands, TX
5.0 Owner on every jobThe person who quotes is the person on your project.
★★★★★ 5.0 Google Rating
5.0 Verified Reviews
1-Year Workmanship Warranty
Same-Day Quote Response
Marble bathroom remodel in The Woodlands, TX Bathroom refresh · The Woodlands
About this package

A modern bathroom — without the gut remodel.

Most homeowners in The Woodlands and Spring don't actually need a full bathroom remodel — they need their existing bathroom to look modern again. The shower is fine, the layout works, but the vanity is dated, the fixtures are tired, the floor is yellowing vinyl, and the whole room feels like it's stuck in 2008.

The Bathroom Refresh package is built for exactly this situation. We replace the visible, high-impact items in 5–7 days with a fixed price you know up front. No tile demolition, no plumbing relocations, no waterproofing complexity — just a noticeably better bathroom in a single work week.

If your shower itself needs work — re-tile, glass replacement, tub-to-shower conversion — that's our Walk-In Shower Conversion package, which is a longer and bigger scope project.

Call for a free estimate
What's included

Every Bathroom Refresh includes

✓ Included in starting price

  • Removal and disposal of existing vanity, faucet, toilet, mirror, and lighting
  • New vanity (3 standard styles to choose from: shaker white, modern slab walnut, or transitional shaker gray)
  • New countertop (cultured marble, quartz, or solid surface — your choice from 3 standard options)
  • New faucet and shower fixtures (Moen or Delta — chrome, brushed nickel, or matte black)
  • New comfort-height toilet (Kohler or American Standard, white)
  • New mirror (framed or frameless — your choice from 3 sizes)
  • New vanity light fixture (3-light or 4-light bar in your finish)
  • Fresh paint on walls and ceiling (1 color of your choice from 8 popular colors)
  • New LVP flooring (luxury vinyl plank — waterproof, looks like wood, 5 standard colors)
  • New shoe-base trim around perimeter to finish the floor install
  • Caulking and finish work around vanity, toilet base, tub/shower edge
  • Final cleanup and walk-through with photos for your records

— Available as add-on (extra cost)

  • Tile shower wall replacement (this is a Walk-In Shower Conversion package — bigger scope)
  • Tub replacement or removal (we leave existing tub in place; if you want it removed see Walk-In Shower Conversion)
  • New tile floor (we install LVP as standard — tile floor is a priced-per-project add-on)
  • Plumbing rough-in changes (moving the toilet, sink, or shower drain location)
  • Electrical changes beyond replacing the existing vanity light (new circuits, outlet additions)
  • Wallpaper, wainscoting, or accent walls (available as add-on — priced per project)
  • Heated floor (add-on — priced per project)
  • Higher-end vanity or fixture upgrades (we offer premium tiers — see pricing below)

All add-ons priced transparently in your written estimate before any work begins.

Project timeline

Day-by-day what happens

A typical 5–7 days timeline. We give you exact dates after the estimate is signed.

Day 1
Demo and disposal

Existing vanity, faucet, toilet, mirror, lights, and old flooring removed and hauled out same day. Shut-offs replaced if needed.

Day 2
Plumbing prep

Plumber on-site for shut-off and drain prep work. Walls and floors prepped for paint and new flooring.

Day 3
Paint and prime

Walls and ceiling primed (if needed) and painted. Most rooms get 2 coats.

Day 4
Floor install

New LVP flooring installed wall-to-wall with proper expansion gaps. Shoe-base trim cut and installed around perimeter.

Day 5
Vanity, toilet, mirror, lights install

Plumber and electrician on-site (separate halves of the day). All new fixtures installed and tested.

Day 6
Caulking and finish

Caulking around all transitions (tub, vanity, toilet base, floor edges). Touch-up paint where needed.

Day 7
Final walk-through

We walk the project with you, address any punch-list items, take final photos, and you're done.

Pricing tiers

What drives the final price

Starting price covers most jobs at the basic tier. Final estimate based on your specific scope, materials, and any add-ons you choose.

Standard

Priced per project

Standard vanity, mid-range fixtures, LVP floor, basic 4-light vanity bar, framed mirror. Best value for guest bath or secondary master.

Premium

Priced per project

Larger or higher-end vanity (waterfall edge, soft-close drawers), designer fixtures (Brizo, Hansgrohe), upgraded lighting, frameless or LED mirror, premium paint.

Luxury

Priced per project

Custom-stained vanity, quartz countertop, premium fixture brands, decorative tile floor instead of LVP, accent wallpaper or wainscoting, designer lighting fixtures.

Frequently asked

Common questions about this package

Still unsure? Call 346 248 74 97.

Yes — cost is driven by the bathroom's size, the length of the vanity, and how much flooring and paint the project requires. Larger master baths need more materials and more trade time than a standard guest bath. We give you a free written estimate within 48 hours so you know the exact number before any commitment.
Yes for most cases. The standard 5–7 day timeline assumes we start Monday and finish Friday or Saturday. If you need faster, we can sometimes compress to 4 days by running plumber and electrician on the same day. Tell us your deadline at the estimate visit.
You can bring your own. We offer 3 standard vanity options at the package price; if you want a specific vanity from Wayfair, Costco, or a designer brand, we'll install yours and adjust the project price accordingly — you handle ordering and any defects/returns. The adjustment will be reflected in your written estimate.
Yes — wallpaper removal is a separate add-on. The cost depends on the number of layers and how the original install was done. We assess this at the estimate visit and include it as a line item in your written quote before any work begins.
Yes — it's included in the package. New toilet (comfort-height, white, your choice of Kohler or American Standard) plus install plus disposal of old toilet. A licensed plumber we work with is on-site that day to make all the connections.
Not the bathroom we're working on — it's fully out of service for 5–7 days. Most clients use a guest bathroom or the master bath if we're working on the guest. We protect the path between work zone and any bathrooms you'll continue using.
Service area

Serving The Woodlands & North Houston

Most of our work is within a 30-minute drive of our Spring, TX HQ.

Ready to start?

Ready to get your bathroom refresh started?

Free written quote within 48 hours. Most projects start within 1–2 weeks.