Full custom kitchen · The Woodlands, TX

Full Custom Kitchen Build in The Woodlands, TX.

Full custom kitchen remodels: layout changes, custom cabinetry, premium materials, on a 5–8 week project — owner-managed every step. Free written estimate.

5.0 · 44 Verified Reviews Fully insured
$1M liability
1-year written
warranty
Custom kitchen remodel in The Woodlands, TX
★★★★★ 5.0 Google Rating
5.0 Verified Reviews
1-Year Workmanship warranty
Same-Day Estimate response
Full custom kitchen builds

What's involved in a build from the studs.

A full custom kitchen build is a major project — typically 5–8 weeks and priced per project based on scope, materials, and layout. It usually includes:

  • Removing existing cabinets, counters, fixtures, and possibly walls
  • Plumbing relocations for sink, dishwasher, refrigerator water
  • Electrical upgrades — new circuits for fridge, microwave, undercabinet lighting
  • Possibly: structural work (removing/adding walls, kitchen island install)
  • New flooring throughout kitchen
  • Custom cabinetry — sized exactly to your space, your color and door style
  • Premium countertops (quartzite, natural stone, or premium quartz)
  • New tile backsplash
  • Sink, faucet, garbage disposal, dishwasher
  • Range hood vent install (often a roof penetration)
  • Paint, trim, finishing

When this scope makes sense

For homes valued $500K+ where the kitchen is dated, the layout doesn't work, or you're planning to stay 7+ years. Mid-range kitchens that just need a refresh aren't this scope — see cabinet painting instead. This is a sub-service of our broader kitchen remodeling in The Woodlands.

What goes into a full custom kitchen build

A "full kitchen build" means complete demolition of the existing kitchen down to studs and subfloor, followed by reconstruction with new cabinets, countertops, plumbing, electrical, flooring, and finishes. This is the largest single-room project in residential remodeling — typically 4–7 weeks on-site, with cost varying widely by kitchen size, cabinet and countertop selection, appliance tier, and whether structural work is involved.

Typical scope of a full kitchen build:

  • Demo of existing cabinets, countertops, appliances, flooring, and backsplash
  • Plumbing rough-in for any layout changes (sink relocation, pot filler, beverage fridge water line)
  • Electrical rough-in (new circuits for cooktop, oven, microwave, dishwasher, undercabinet lighting, island outlets)
  • Drywall repair after demo and any wall removals
  • New flooring (often hardwood, large-format porcelain, or LVT)
  • Cabinet installation (custom millwork or premium semi-custom)
  • Countertop fabrication and install (quartz, quartzite, granite, or marble)
  • Backsplash installation
  • Appliance install
  • Lighting install (recessed, pendants, undercabinet)
  • Final finish work — caulking, paint touch-ups, trim

Scope tiers for full custom kitchens in The Woodlands

  • Mid-range custom — Semi-custom cabinets (KraftMaid, Medallion), quartz countertops, mid-grade appliances (KitchenAid, GE Cafe), engineered hardwood or LVT flooring, standard tile backsplash. Common scope for kitchens in 2,000–3,000 sq ft homes in Cochran's Crossing, Indian Springs, Alden Bridge. Priced per project — free written estimate.
  • Premium custom — Full-custom local cabinet shop, quartzite or premium quartz countertops, high-end appliances (Wolf, Sub-Zero, Miele), engineered hardwood, mosaic or stone backsplash, designer lighting, often a wall removal to open the kitchen to the great room. Common in larger Sterling Ridge or Creekside Park homes. Priced per project — free written estimate.
  • Luxury custom — Full custom millwork with painted or specialty wood species, marble or rare quartzite slab countertops, full Sub-Zero/Wolf/Cove appliance packages, integrated panel-front refrigerator, hidden walk-in pantry, custom lighting design, hood with custom enclosure. Carlton Woods and luxury custom-home territory. Custom quote.

How long is the kitchen out of service?

For a typical full kitchen build (5–6 weeks total), the kitchen is fully unusable for the entire duration. We help clients set up a "temporary kitchen" before demo starts: usually a microwave, toaster oven, electric kettle, mini-fridge, and disposable plates set up in a dining room, garage, or basement area. Most clients eat out 3–4 nights/week and prep simple meals in the temp kitchen for the rest. Some clients stay elsewhere for the messiest 7–10 days during demo and rough-in.

Common Woodlands kitchen layout changes

Most full kitchen builds in The Woodlands include some layout change beyond like-for-like replacement:

  • Wall removal between kitchen and family room — by far the most common change. Opens sight lines, creates "great room" feel. Requires beam install if load-bearing (LVL beam sized to span). Most kitchens originally separated by a load-bearing wall in The Woodlands homes built 1995–2010. Priced per project.
  • Island addition — Adding or expanding an island, often with seating for 3–5. Requires electrical rough-in for outlets and dedicated circuits if appliances are island-mounted. Priced per project based on size and finish.
  • Walk-in pantry conversion — Converting a coat closet, hall closet, or part of an attached laundry into a walk-in pantry. Scope varies by size and millwork — free written estimate.
  • Beverage center / coffee bar nook — Dedicated zone with beverage fridge, dishwasher drawer (sometimes), espresso machine plumbing. Priced per project — free written estimate.
Frequently asked

Common questions

Honest answers to what homeowners ask most. Still unsure? Call 346 248 74 97.

5-8 weeks typical. Custom cabinet manufacturing is the longest single bottleneck (4-8 weeks lead time before they arrive on site). We start demo when cabinets ship.
Budget depends on kitchen size, cabinet quality, countertop material, appliance tier, and whether structural changes are involved. The range is wide — a mid-range custom build with semi-custom cabinets and quartz counters costs considerably less than a luxury build with full custom millwork and natural stone. We give a free written estimate within 48 hours after an on-site visit so you have an exact number before any commitment.
Recommended for full custom builds. We can refer designers we've worked with. Designer cost varies by project scope, but good design often pays for itself in better space planning and material selection. Designer fees are quoted separately from construction.
Plan 8–12 weeks before your desired start date. Custom cabinet lead times alone are 6–10 weeks from design approval. Stone countertop fabrication is 2–4 weeks after templating (which happens after cabinet install). High-end appliances (Sub-Zero, Wolf) sometimes have 8–16 week lead times. We start the design and material selection 6–8 weeks before demo so everything arrives on schedule.
We do basic kitchen design (cabinet layout, dimensions, work-zone optimization) included in our service for most projects. For luxury kitchens with complex layouts, custom millwork details, or specific aesthetic direction, we recommend (and can refer) a kitchen designer who works in The Woodlands market. Designer fees are quoted separately from construction; on luxury projects this is money well spent.
Plumbing permit (any rough-in changes), electrical permit (new circuits, panel work), and a building permit if you're removing walls or modifying load paths. Montgomery County permits typically issue in 5–10 business days. We pull all required permits and coordinate inspections.
Service area

Serving The Woodlands & North Houston

Most of our work is within a 30-minute drive of our Spring, TX HQ.

Ready to start?

Get a free, no-obligation quote.

Free estimate, no obligation. Same-day response on weekdays. The owner walks your project and sends a clear written estimate.