New deck construction (wood or composite), deck repair, board replacement, railing rebuild. Built specifically for Texas heat, humidity, and the wood-rot issues that come with both. Done in one week.
Texas weather is hard on outdoor wood. UV breaks down finishes, humidity feeds rot, summer heat warps boards, and storm cycles loosen fasteners. Most decks in The Woodlands area need either repair work every 5–7 years or full replacement around year 15–20.
Our Deck Build & Repair package handles both ends of that spectrum: brand-new deck construction (wood or composite, freestanding or attached) and repair work on existing decks (board replacement, railing rebuild, joist repair, fastener replacement, re-staining). 3–7 days of work depending on size and scope.
We've built and repaired decks across The Woodlands, Spring, Conroe, Magnolia, and surrounding areas — from small 8×10 attached decks to 600+ sq ft entertaining decks with built-in benches and pergolas. Pricing tiers below cover the most common sizes; final estimate based on your specific scope.
All add-ons priced transparently in your written estimate before any work begins.
A typical 3–7 days timeline. We give you exact dates after the estimate is signed.
Stake out new deck footprint or remove existing deck. Mark sprinkler/utility lines. Order materials if not pre-staged.
Install concrete piers or post anchors. Set treated lumber posts. Verify level and square. (Inspection if permit required — adds 1 day for inspector schedule.)
Install ledger board (if attached deck), set rim joists, install internal joists at proper spacing. Hangers and structural fasteners.
Install deck boards starting from house side, working out. Even spacing for drainage and expansion. Cuts at edges and around posts.
Build railing system per code (36" or 42" height depending on deck height). Construct stairs if needed.
Wait 24+ hours for any moisture from cuts to evaporate. Apply 1 coat semi-transparent stain. Composite decks skip this day.
Haul all debris. Clean deck surface. Walk-through with you to demonstrate features and warranty.
Starting price covers most jobs at the basic tier. Final estimate based on your specific scope, materials, and any add-ons you choose.
Repair existing deck (board replacement, railing rebuild, structural fixes) or build small new deck up to ~150 sq ft. Pressure-treated lumber. Most popular tier for fixing weather damage.
150–350 sq ft new deck with railing and stairs. Pressure-treated wood or budget composite. Includes basic site prep, foundation, framing, decking, railing, finish.
350+ sq ft deck or premium composite (Trex Transcend, TimberTech Azek). Hidden fastener system, premium railing (composite or aluminum), built-in features.
Free written quote within 48 hours. Most projects start within 1–2 weeks.
📞 (346) 334-4469